Anchor Point Inspection & Testing
Inspection and proof load testing of roof and wall anchor points to BS 7883 and BS EN 795.
View service →Rope access and abseil anchors inspected and tested for rope access, cleaning and facade maintenance.
Abseil anchors carry rope access technicians for window cleaning, facade repairs and inspections. They must take high loads and are often fixed to roofs and parapets that have changed since installation.
We inspect each abseil anchor, test it where required and confirm it is suitable for the rope access work carried out from it.

BS 7883Code of practice for the design, installation, inspection and maintenance of anchor systemsBS EN 795Anchor devices, types A to EBS 8437Selection, use and maintenance of personal fall protection systemsWAHR 2005Work at Height Regulations 2005The address and a rough count of anchors, eyebolts and safety lines is enough to price the job.
Priced per site, with multi-site estates grouped into efficient routes.
Every anchor inspected, proof load tested where required, and tagged on site.
Report with BS 7883 results, roof plan, certificates and the next inspection date.
Rope access teams for window and facade cleaning, maintenance, surveys and repairs.
We record edge protection and rope routing at each anchor, and flag sharp edges or hazards.
Yes. We plan access and exclusion zones around building use.
Inspection and proof load testing of roof and wall anchor points to BS 7883 and BS EN 795.
View service →Window cleaning and maintenance eyebolts inspected and pull tested, with every eyebolt numbered and certified.
View service →Horizontal lifeline systems on roofs inspected, tensioned, tested and recertified to BS EN 795 Type C.
View service →Vertical fall arrest lines and rails on ladders and structures inspected, tested and recertified.
View service →Mansafe and cable-based roof safety systems inspected, tested and certified, whatever the manufacturer.
View service →Send the site address and a rough count of anchors and lines. We'll come back with a fixed price and the earliest date.